Compare Commercial Building Surveys

Why are our surveys better than the competition?

Below is an example of one of our survey's compared to one produced by a mortgage companies valuation survey.

Alternatively, have a look at our 'why use us' page - here.

COMMERCIAL BUILDING SURVEY

OF
An Office Building

commercial building survey

FOR
Mr Office

Prepared by:
GEM Associates Limited
INDEPENDENT CHARTERED SURVEYORS
Marketing by:
www.1stAssociated.co.uk
0800 298 5424

CONTENTS

INTRODUCTION

REPORT FORMAT
SYNOPSIS

EXECUTIVE SUMMARY
SUMMARY UPON REFLECTION

EXTERNAL

CHIMNEY STACKS AND ROOF WINDOWS
ROOF COVERINGS
ROOF STRUCTURE
RAINWATER GOODS
WALLS
EXTERNAL JOINERY AND BRICK DETAILING
EXTERNAL DECORATIONS

INTERNAL

CEILINGS, WALLS, PARTITIONS AND FINISHES
CHIMNEY BREASTS, FLUES AND FIREPLACES
FLOORS
DAMPNESS
INTERNAL JOINERY
TIMBER DEFECTS
INTERNAL DECORATIONS
THERMAL EFFICIENCY
OTHER MATTERS

SERVICES

ELECTRICITY
GAS
PLUMBING AND HEATING
TOILET FACILITIES
MAIN DRAINS

OUTSIDE AREAS

OUTBUILDINGS
EXTERNAL AREAS
POINTS FOR LEGAL ADVISOR

APPENDICES

LIMITATIONS
GENERAL INFORMATION ON THE PROPERTY MARKET

INTRODUCTION

Firstly, may we thank you for your instructions; we have now undertaken a Building Survey (formerly known as a Structural Survey) of the aforementioned property.

The Building Survey takes the following format; there is an introductory section (which you are currently reading), which includes a synopsis of the building, and a summary of our findings.

We then go through a detailed examination of the property starting with the external areas working from the top of the property down, followed by the internal areas and the building‘s services. We conclude with the section for your Legal Advisor.

We are aware that a report of this size is somewhat daunting and almost offputting to the reader because of this. We would stress that the purchase of a property is usually one of the largest financial outlays made (particularly when you consider the interest you pay as well).

We recommend that you set aside time to read the report in full, consider the comments, make notes of any areas which you wish to discuss further and phone us.

We obviously expect you to read the entire report but we would suggest that you initially look at the summary, which refers to various sections in the report, which we recommend you read first so that you get a general feel for the way the report is written.

As part of our service we are more than happy to talk through the survey as many times as you wish until you are completely happy to make a decision. Ultimately, the decision to purchase the property is yours but we will do our best to offer advice to make the decision as easy as possible.

REPORT FORMAT

To help you understand our Report we utilise various techniques and different styles and types of text, these are as follows:-

GENERAL/HISTORICAL INFORMATION

This has been given in the survey where it is considered it will aid understanding of the issues, or be of interest. This is shown in “italics” for clarity.

TECHNICAL TERMS DEFINED

Throughout the Report, we have endeavoured to define any technical terms used. This is shown in “Courier New” type face for clarity.

PHOTOGRAPHS

photo exampleWe utilise photographs to illustrate issues or features. In some photographs a pencil has been used to highlight a specific area (with this property we have taken approximately one hundred photographs in total and we have enclosed a sample of these within the report).

 

 

 

ORIENTATION

Any reference to left or right is taken from the front of the property, including observations to the rear which you may not be able to physically see from the front of the property.

ACTION REQUIRED AND RECOMMENDATIONS

We have used the term ACTION REQUIRED where we believe that there are items that you should carry out action upon or negotiate upon prior to purchasing the property.

Where a problem is identified, we will do our best to offer a solution. However, with most building issues, there are usually many ways to resolve them dependent upon cost, time available and the length of time you wish the repair/replacement to last.

SYNOPSIS

SITUATION AND DESCRIPTION

This is a detached Freehold office building, with the original property to the front, which has been amended and altered over the years; of particular note is the alteration to the staircase area. To the rear of the property is a newer three storey extension.

There is parking around the property although the car park is unmarked; we would estimate that there are a dozen or so places.

We believe that the property was originally built at the start of the 19th Century, possibly between the war years. If the exact age of the property interests you your Legal Advisor may be able to find out more information from the Deeds.

Putting Life into Perspective!

Some of the things that were happening around the time the property was built:

1901 Queen Victoria Died

1903 First flight by Wright Brothers

1903-1928 The Campaign for Women‘s Suffrage

1912 The Beginning of the Motoring Age

1914-1918 World War I

1920s Television Invented

1927 Charles Lindbergh flies across the Atlantic

1928 Vote for Women aged over 21

1928 Alexander Fleming develops penicillin

1939-1945 World War II (6 June 1944 D-Day)

EXTERNAL PHOTOGRAPHS

Front View

Front View

Right Hand Side View

Right Hand Side View You can see how close the adjoining office block is

Left Hand Side View

Left Hand Side View ‘‘Newish‘ Property

Left Hand Side View

Left Hand Side View Original Property

The right hand side of the property

The right hand side of the property was very difficult to view.

ACCOMMODATION AND FACILITIES

Ground Floor

The ground floor accommodation consists of:

  • Porch Entrance
  • Front Right Hand Office (3.92m x 3.95m)
  • Reception Area (6.5m x 3.5m)
  • Rear Office (10.15m x 4.98m)
  • Boiler Room
  • Male and Female W.C.s and wash hand basins
  • Associated Access Corridors

First Floor

The first floor accommodation consists of:

Old Part of Property

  • Front Right Hand Office (3.04m x 2.43m)
  • Front Left Hand Office (3.62m x 3.47m)
  • Rear Left Hand Office (3.98m x 3.93m)
  • Male and Female W.Cs

‘New‘ Part of Property

  • Kitchen (2.97m x 3.94m)
  • Office Three (2.8m x 3.9m)
  • Office Four (2.94m x 4.97m)
  • Associated Access Corridor

Second Floor

The first floor accommodation consists of:

  • Office (4.97m x 8.26m, up to cupboard space)

Note: All rooms have been measured as required by the ‘Standard Method of Measurements‘ used by the Royal Institution of Chartered Surveyors (RICS).

INTERNAL PHOTOGRAPHS

The following photos are of the internal of the property to help you recall what it looked like and the general ambience (or lack of). We have not necessarily taken photographs of each and every room.

Original Part of Property

Ground Floor

Reception

Front Right Hand Office

Gent‘s W.C.

Newer Part of the Property

Ground Floor

Ground floor

Ground floor

Original Part of Property

First Floor

Ladies W.C.

Gent‘s W.C.

Front Left Hand Office

Front Right Hand Office

Rear Left Hand Office

Newer Part of the Property

First Floor

Kitchen

Office adjoining Kitchen

End Office

Newer Part of the Property

Second Floor

Second Floor Office

SUMMARY OF CONSTRUCTION

EXTERNAL

Older Part of the Property

Chimneys:
Three brick chimneys

Roofs:
A pitched main roof, clad with slate tiles and a flat lead roof to the bay window at the front of the property

Gutters and Downpipes:
Plastic

Soil and Vent Pipe:
Cast Iron

Walls:
Predominantly Flemish bond brickwork with painted render at high levels and some stretcher bond brickwork and cladding to the staircase extension, which leads us to believe it‘s newer (assumed)

External Joinery:
A mixture of painted metal windows and timber windows. Painted timber fascias and soffits

Newer Part of the Property

Roof Windows/ Skylights
Four purpose made plastic roof windows / skylights

Roofs:
A flat roof finished in felt

Gutters and Downpipes:
Plastic

Soil and Vent Pipe:
None, all believed to feed into the older part of the property

Walls:
Stretcher bond brickwork, probably on a steel frame? (assumed)

External Joinery:
Predominantly metal windows. Painted timber fascias and soffits

INTERNAL

Older Part of the Property

Ceilings:
A mixture of the original lath and plaster and plasterboard (assumed)

Walls:
A mixture of solid and studwork (assumed)

Floors:
Ground Floor: concrete (assumed)

First Floor:
Joist and floorboards (assumed)

Newer Part of the Property

Ceilings:
Plasterboard (assumed)

Walls:
Predominantly studwork (assumed)

Floors:
Ground Floor: concrete (assumed)

First and Second Floor:
Joist and floorboards, possibly with steel beams (assumed)

SERVICES

We believe that the property has a mains water supply, drains, electricity and gas (assumed).

The above terms are explained in full in the main body of the Report. We have used the term ‘assumed‘ as we have not opened up the structure.

EXECUTIVE SUMMARY

Summaries are dangerous as they try to précis often quite complex subjects into a few paragraphs. This is particularly so in a summary about someone‘s future business when we are trying to second-guess what their priorities are, so it is important the Report is read in full.

It is inevitable with a report on a building of this nature that some of the issues we have focussed in on you may dismiss as irrelevant and some of the areas that we have decided are part of the ‘character‘ of this property you may think are very important. We have taken in the region of 50 plus photographs during the course of this survey and many pages of notes, so if a comment has not been discussed that you are interested in/concerned about, please phone and talk to us before you purchase the property (or indeed commit to purchasing the property), as we will more than likely have noted it and be able to comment upon it. If we have not we will happily go back. Having said all of that, here are our comments:

Generally we found the property to be in below average condition for its age, type and style and there are some specific issues. The Executive Summary normally looks at ‘The Good‘, ‘The Bad‘ and ‘The Ugly‘ but in this case we have had to turn it around to ‘The Good‘, ‘The Ugly‘ and ‘The Bad‘, to help distinguish what in our mind are the main issues.

The Good

Survey reports often are full of only the faults and general ‘doom and gloom‘, so we thought we would start with some positive comments on the property!

  • This is a detached Freehold office.
  • The space has a good mixture of offices and open space to the newer extension, where the office space and size can be changed to suit requirements.
  • There is car parking space.

We are sure you can think of other things to add to this list.

The Ugly

We normally put here things that we feel will be difficult to resolve and will need serious consideration.

  1. Fire Requirements

    We spoke about the requirement for fire exits in the property. As we understand it the maximum distance allowed is 18 meters to a protected fire escape (the stairway area). Utilising the two staircases as fire exits the maximum distance travelled is approximately 10 meters, therefore not requiring a second fire exit.

    However, a general upgrade of the Fire Regulations in the property is required to protect the fire escape area/the staircase, which should have 30 minute fire doors surrounding it and 60 minute fire walls. The doors to the staircase should have vision panels; there should be photo illuminated signs utilising symbols; and the sides and the underside of the stairway should also be protected.

    There is also a need for fire extinguishers in the property and an alarm system linked between floors. We are suggesting wireless alarm systems, although we have not personally utilised these, as this reduces the need for wiring!

    ACTION REQUIRED: We recommend the property is upgraded to meet approved document B of the Building Regulations. Your Legal Advisor needs to confirm if the property has a Fire Certificate and advise us immediately if it does not.
    ANTICIPATED COST: We would expect costs in the region of £10,000 - £20,000, but quotations from a specialist company are required. Within this cost we have also allowed for asbestos testing, which looks to have been used on some of the doors. Asbestos was officially banned in 1999, although its use was much reduced in the 1990s when alternatives were used. We note there is an opening plaque stating that this property was re-opened in 1992 and we are therefore hopeful that this product may not be asbestos but a modern alternative. The only way to be certain is to test for it.

    Please see the Doors Section and Other Matters Section of this Report.

  2. High Level Work

    Roof imageThere is work required to the roof to make it watertight, particularly the flat roof over the newer part of the offices, although there is also water ingress via blocked gutters and deterioration to the chimneys to the older part of the property.







    Woodwool Slabs

    Ceiling in second floor officeThe main issue as we see it is that the roof construction in the newer part of the office block is in woodwool slabs. There is an area where the water has come completely through and we also expect there to be damage elsewhere. Woodwool slabs lose their strength when wet sometimes and we therefore feel that you should look at a worse case scenario where the entire roof and woodwool slab decking needs to be removed.

    ACTION REQUIRED: Remove existing felt finish and check the decking (allowing for complete replacement of the woodwool slabs), add an insulation material cut to falls with a high performance felt over it, increase the size of the hopper head to the rear of the property to cope with the water, check that the roof windows / skylights are watertight and replace if required.
    ANTICIPATED COST: In the region of £10,000 - £20,000. You do need to obtain quotations for this work and it will be considerably less if the woodwool slabs do not need to be replaced. As this is high level work scaffolding may be required.

    Please see the Roof Coverings Section of this Report.

  3. Drainage

    Drainage imageThe drains remain a mystery; we ran the taps for approximately an hour, as you saw we could see water into the first manhole, and also leaking from the surrounding pipes, but not into the second manhole leading to the road. There also look to have been repairs/replacement of the gutters both on the right hand side (all directions given as you face the property) and also on the left hand side.

    ACTION REQUIRED: We feel the first part of your negotiations and a very good test as to whether the current owners are willing to negotiate is a Close Circuit TV (CCTV) report on all the drains and carry out all recommendations. As discussed the big danger of leaking drains is that they undermine the foundations, particularly if sand has been used to infill below, as would appear to be the case from your solicitor‘s findings. Your solicitor should provide us with a copy of the report advising about the in-filling.
    ANTICIPATED COST: Assuming there is no foundation repairs required we would set aside £5,000 - £10,000 for renewal of the drains. We do not feel that repair or lining will be possible in this instance, but this view is taken on the condition of the ground surrounding the drains, which is hollow in some areas.

    Please see the Main Drains Section of this Report.

  4. Cracking and Possible Movement?

    Cracking to the brickwork under our hammer handle.There is cracking in the structure both to the render externally and internally to the plasterwork and also to the brickwork on the newer office block extension. We feel the render has been specifically painted over (painted to sell) to hide damage and deterioration (as you pointed out they have actually missed painting part of the render).








    Cracking to plaster internally.The cracking indicates movement to the structure. Having reconsidered this we feel the movement between the old and newer structures is over and above that usually caused by differential movement.

    ACTION REQUIRED: You need to specifically ask the present owners if they have made an insurance claim relating to the movement in the property or to the best of their knowledge if one has been made in the past. You should ask them to make a claim under their existing insurance policy. This again is a very good measure as to how willing they are to negotiate and help the sale.
    ANTICIPATED COST: The insurance company will need to register the claim before you should proceed with the purchase of this property. There will normally be an excess to pay; this should be paid for by the present owners. They will usually want to monitor this type of problem for a year before commenting and advising.

    Please see the Walls Section of this Report.

  5. Value of the Property

    If the property was in ‘average‘ condition we believe the £290,000 would be a high price; as it is with the various issues we feel the price is unacceptable. We would value this property as being worth between £225,000 - £250,000.

    Please see the Valuation document in the Appendices at the end of this report.

The Bad

Problems / issues raised in the ‘bad‘ section are usually solvable, but often need negotiation upon. However, a large number of them may sometimes put us off the property.

  1. High Level General Maintenance to the Roof

    Slipped slates.We noted to the older part of the property several general maintenance items at high level, for example we could literally see light coming in between the slates and that some slates have been displaced or slipped.








    Grass growing out of the gutters.We also noted that some of the guttering has grass literally growing from it; this of course needs clearing. As this is high level and awkward work in some areas you may need specialist equipment to gain access.

    We also noted that dampness is coming in through some of the chimneys; this also requires checking.

    ACTION REQUIRED: A close inspection of the high level areas and repair as necessary.

    ANTICIPATED COST: In the region of £5,000 - £10,000, as you are likely to need scaffolding and you are likely to find other things to repair when at roof level.

    Please see the Chimneys Section and Roof Coverings Section of this Report.

  2. Render Deteriorating - Painted to Sell

    In this age of property the render will be starting to deteriorate and will need fairly regular maintenance. There have already been some repairs carried out where there were once tiled drips (as can be seen on the rest of the property still). Thinking this through this is probably the area where the water has damaged the render most severely. This looks to have been a recent repair as dampness can still be seen to be coming into the property when tested with our electronic damp meter.

    RenderWe could also see cracking to some parts of the render and when we tapped it with the back of our hammer handle some of it was loose.

    ACTION REQUIRED: You need to accept that there will be general maintenance to the render and redecorating and also repairs needed to the plaster inside that is affected by the dampness coming through.

    We do need to establish whether the movement is progressive or not. Please see our earlier comments.

    ANTICIPATED COST: On-going.

    Please see the Walls Section of this Report.

  3. Lead Flat Roof over Bay Window

    Roof coveringThis roof needs repair as holes are visible in it.

    ACTION REQUIRED: Repair / replace.

    ANTICIPATED COST: In the region of £500 - £1,000.

    Please see the Roof Coverings Section of this Report.




  4. Rising Damp

    To the majority of the property you have rising damp. There have been previous efforts to combat this with damp proof courses being added.

    Drainage sketch

    Rising damp to the front office.
    Rising damp to the front office.

    Dampness coming up through the floor
    Dampness coming up through the floor.

Content being created...

We are sure you'll agree our surveys are considerably better than the rivals. To get a quote for a survey on your property click here.


Home Buyers Reports Property Surveys - why we're the best. Engineers Reports
© Copyright 1stassociated.co.uk

Quick Links:

Residential Property Surveying

Autumn House Problems
Accessing Chimneys
Advice On Disputes
Animals and Plants Living around your Building
Approved Inspectors -v- Local Authority Building Control Officers
Asbestos
Asphalt Flat Roofs
Basement Conversions
Boundary Disputes
Boundary Disputes Solved with Common Sense
Building Disputes
Building Survey Glossary
Building Surveys or Structural Surveys
Buying and Selling General Information
Buying at Auction Information
Buying Off-Market -v- Buying at Auction
Buying Property at Auction
Can you trust a Chartered Surveyors Valuation
Cavity Wall Problems
Chartered Surveyors pt1
Chartered Surveyors pt2
Cheap Building Surveys, or being wrongly advised by your Building Surveyor
Close Boarding
Chimney Issues
Common Chimney Problems
Compare Building Surveys
Compare Home Buyers Reports
Common Pitched Roofs
Condensation
Condensation
Condensation and Damp Walls
Cowboy Builders and Cowboy Clients
Cracking and Movement Information
Cracking to my Plaster
Cracks in my Wall
Damp in properties
Damp Meters
Damp Proof Course, How do older properties keep dry without one?
Damp Proof Courses, What are these for?
Damp Proof Courses Defined
Damp Proof Specialists, Talk to us First
Damp Surveying To A Different Standard
Dampness Defects Report
Dampness Problems
Damp Walls
Dampness A Different View
Definitions of Building terms
Deteriorating Brickwork Cement Repointing
Disputes
Do Banks and Building Society Surveyors Really Value Property?
Do Chartered Surveyors Value Property?
Dormer Roof Leaking
Drainage and Manholes
Dry Verges
Energy Surveys or Energy Condition Reports v Thermal Imaging
Engineers Report
Environmental Reports
Estate Agents
Estate Agent, There is no point being honest
Estimating Building Costs
Expert Witness
Fascia and Soffit Board Problems
Financial Advisers
Flat Roofs
Foundations
Foundations and Underpinning
French Drains
From Fire Marks to Surveyor John Braid Wood
Georgian and Regency Properties and their common problems
Get a Survey Quote
Good Design can Save you Money
Health and Safety in the Property Industry
How do older properties keep dry without a damp proof course?
How, in our experience, insurance companies deal with cracks in properties
How to Buy a Property at Auction, FAQs
How to get on with your Builder
Independant Financial Advisers - Are they Independent?
Independant Financial Advisors pt1
Independant Financial Advisors pt2
Insulation, DPCs and Energy Performance Certificates
Insurance Claim
Insurance Claim Against Surveyors
Insurance Companies
It is important to remember where builders come from
Leaking Dormer Roofs
Leaking Flat Roofs
Lime Mortar
Listed Buildings and Character Properties
Location, Location, Location
Loft Conversions
Modern Timber Frame Properties and their common problems
Mortgage Valuations
Mortgages Aren't they interesting?
Movement and Cracking Information
My property has been repointed in a cement mortar, what can I do?
NHBC Warranty Problems
Noisy Neighbour - A Different Sort
Non Traditional Housing
Not So Common Pitched Roofs
Parking Dispute
Party Walls
Pre and Post Suburban Properties and their common problems
Pre Sales Survey
Pre School And Day Nursery Dampness And Condensation Problems
Problem Solving
Problems with cap over and overclad fascia and soffit boards
Problems with fascia and soffit boards
Problems with Roof Windows, Roof Lights and Sky Lights
Property Eras and Common Problems
Property Acquisition Companies
Property Investors Wanted
Property Management - It's all about cash flow
Property Refurbishment
Property Valuations
Repairing Cracks
Residential Surveys
M Rising Damp and Independent Reports
Rising Damp, Condensation and Damp through Walls
Roof Problems and Information
Roof Problems
Roof Windows, Roof Lights, Sky Lights and Light Tunnels
Settlement, Subsidence and Heave
Shared Freehold and Problems with Damp
Should I buy or sell land?
Should I have a Structural Survey?
Specific Defects Reports
Spring House Problems
Summer House Problems
Structural Cracking
Structural Report
Structural Surveys
The Great Fire of London
Thermal Imaging
Traditional and Non-Traditional Properties, What are they?
Traditional Tudor Timber Frame Properties and their common problems
Unhealthy alliance between Estate Agents and Surveyors
Valuation
Valuation the same, Snap
Value and Worth The Moral Maze
Valuations Information
Victorian and Edwardian Properties and their common problems
Wall Issues
Wall Tie Problems
What Is An Independent Survey?
Winter House Problems
What is my Home Worth?
Where is my boundary?
Why Have One Of Our Surveys?
Why Have a Residential Survey?
Why Use Us?
Why You Have Never Seen any Building Surveys or Structural Surveys Like Ours
Woodworm Treatment
 

Commercial Property Surveying

Directories and Indexes that you can find us in on the Internet

A-Z of Dilapidations
Asbestos
Beware of the Late Served Schedule of Dilapidations by the Landlord
Break Clauses, Are they Worth it?
Building Survey Glossary
Buying a Commercial Property at Auction
Buying at Auction Information
Commercial Property, What is a Primary, Secondary or Tertiary Property?
Commercial Surveys
Commercial Survey Forms
Compare Commercial Surveys
Compare Commercial Building Surveys
Commercial - Dealing with Asbestos in Retail Units
Dilapidations and Chartered Accountants and your Accounts
Dilapidantions Negotiations (Landlord or Landlord's Surveyor not acting fairly)
Dilaps and Poker Playing
Dilaps Break Clauses
Dilaps Claim
Dilaps Claim by a Landlord
Dilaps Disagreements on the Repairs Needed
Dilaps Dilaps Help Course Book, Comments by Vivien King
Dilaps More Information
Experienced Businesspeople understand the importance of a Schedule of Condition being appended to a Lease
Expert Witness
Good Design can Save you Money
Health and Safety in the Property Industry
How do Civil Procedure Laws Affect Dilapidations
How to read a Dilapidations Schedule
Industrial Commercial Properties - The Asbestos Cement Dilemma
Information about Buying at Auction
Interim Dilapidations
Landlords
Landlords and Tenants
Landlords can you have too good a retail tenant?
Landlords can you have too good an industrial tenant?
Landlords Industrial Properties
Landlord's view on a new business taking on a lease
Landlords Retail Investment Properties
Landlords What can we do for You?
Lease Negotiations with your Landlord
My First Lease What Should I Do?
Negotiating Dilapidations
Negotiating with a Landlord
Negotiating FRI Lease Clauses
Property Report
Reading your Village, Town and City
Retail Leases or Licences
RICS Guidance Notes on Dilapidations
Schedule of Condition - What should I expect?
Scedule of Conditions for Commercial Properties
Scott's Schedules
Section 18 Valuation
Structural Survey
The Lazy Solicitor and the Lease
Tenants
Terminal Schedules of Dilapidations
Vivian King on RICS Guidance Note and Dilaps
What is a Schedule of Condition?
Why Advanced Rent
Your Lease in Plain English

Links to Surveyors and Property Related Companies Around the World

 

Property Courses

Dilapidations - New Improved Presentations Click Here

Dilapidations - Original Presentations Click Here

Party Walls Presentations Click Here

Building Surveying Presentations Click Here

Building Surveys New Improved Click Here

Final Countdown Presentations Click Here

Lectures 2009 Click Here

Lectures 2010 Click Here

Building Pathology
Building Survey Glossary
Building Surveying Acapulco Presentation
Building Surveying Clients and Introduction Presentation
Building Surveying Executive Summaries Presentation
Building Surveying Follow the Trail Presentation
Building Surveying Survey Groups and Managing Presentation
Building Surveying Project Minutes
Building Surveying Questions Georgian and Regency
Building Surveying Questions Modern Timber Frame
Building Surveying Questions Pre and Post Suburban Years
Building Surveying Questions Traditional Timber Frame
Building Surveying Questions Victorian and Edwardian
Buying and Selling Your Property Course: Course Aim
Commercial and Section 18 Valuations Presentation 5
Commercial Building Survey Example Presentation 5
Dilapidations Courses
Dilapidations Courses
Dilapidations Follow the Trail Presentation 3
Dilapidations Introduction to Surveying Presentation
Dilapidations Legal Framework Presentation 4
Dilapidations Overview and Schedules of Condition New Presentation 1
Dilapidations Overview and Schedules of Condition Presentation 1
Dilapidations Review Industrial New Presentation 3
Dilapidations Review Property Reports New Presentation 2
Dilapidations Review Schedules of Condition and Property Reports New Presentation 1
Dilapidations Review Industrial Presentation 3
Dilapidations Review Property Reports Presentation 2
Dilapidations Review Schedules of Condition and Property Reports Presentation 1
Dilapidations Review of Schedules of Condition and Property Reports Presentation 3
Dilaps Help Course Book, Comments by Vivien King
Dilaps Help Presentation 9
Property Eras Georgian and Victorian Photos Presentation
Property Eras Georgian Photos Presentation
Property Eras Modern Photos Presentation
Property Eras Post War and Modern Photos Presentation
Property Eras Post War Photos Presentation
Property Eras Regency, Victorian, Post War and Modern Photos Presentation
Property Eras Tudor Photos Presentation
Property Eras Victorian Photos Presentation
Estimating Building Costs Presentation 5
Final Countdown - Last 3 Weeks Presentation
Final Countdown - Dilapidations Example Presentation
Final Countdown - Schedule of Condition Example Presentation
Final Countdown - Last 2 Weeks - Expert Witness Presentation
Final Countdown - Last 2 Weeks - Speaker Review Presentation
Final Countdown - Last Week - Party Walls Presentation
Goals, Presentations and Offices Presentation 6
Improving Your Presentation
Industrial Dilapidations Presentation 3
Industrial Unit Dilapidations Issues in Photos Presentation 3
Leases RICS Guidance and Protocol Presentation 3
Our Beliefs and Values
Outstanding Building Surveys Presentation
Party Walls Five Types of Party Walls Presentation 1
Party Walls Example used in Presentation 1
Presentations, New Presentation 8
Presentations, Presentation 8
Property As An Investment Course
Property Report and Schedule of Condition Example Presentation 5
Property Courses
Reading your Village, Town and City
Reading your Village, Town and City for Dilaps Students
RICS Guidance Notes Presentation 7
Schedules of Dilapidations Review Presentation 6

1st Associated Chartered Surveyors Are Also Available in the Following Areas:

South West

Cornwall
Devon
Somerset
Dorset
Wiltshire
Hampshire

South East

Sussex
Surrey
Kent
Essex
Hertfordshire
Middlesex
Berkshire
Oxfordshire
Buckinghamshire
Bedfordshire
 

East

Norfolk
Suffolk

East Midlands

Northamptonshire
Huntingdonshire
Cambridgeshire
Rutland
Leicestershire
Nottinghamshire
Derbyshire

West Midlands

Warwickshire
Staffordshire
Worcestershire

West Country

Gloucestershire
Hereford
Shropshire
 

North East

Cheshire
Lancashire
West Morland
Cumberland

North

Yorkshire

North West

Northumberland
Durham

London

Central London
- City of London
- City of Westminster
- Soho
- Kensington
- Chelsea
- Hammersmith and Fulham
- Wandsworth
- Lambeth
- Southwark
- Tower Hamlets
- Hackney
- Islington
- Camden
- Brent
- Ealing
- Stratford
- Hounslow
- Richmond upon Thames
- Kingston upon Thames
- Merton
- Sutton
- Croydon
- Bromley
- Lewisham
- Greenwich
- Bexley
- Chiswick
- Marylebone
- Havering
- Barking
- Dagenham
- Redbridge
- Newham
- Waltham Forest
- Haringey
- Enfield
- Barnet
- Harrow
- Hillingdon
North London
South London
East London
West London

This firm does not accept service of documents by email or fax

Admin/Registered Office:

Hoo View House
Stanley Street
Bedford
Bedfordshire
MK45 7RU