JOB REFERENCE: J21463/RBS/RM/MH/MGM
RESIDENTIAL BUILDING SURVEY
OF
Leasehold Flat in Newly Converted Victorian Property
FOR
Ms A Purchaser
Prepared by:
INDEPENDENT CHARTERED SURVEYORS
Marketing by:
www.1stAssociated.co.uk 0800 298 5424
CONTENTS
INTRODUCTION
REPORT
FORMAT
SYNOPSIS
EXECUTIVE SUMMARY
SUMMARY UPON REFLECTION
EXTERNAL
CHIMNEYS, PARAPET WALLS AND ROOF WINDOWS
ROOF COVERINGS AND UNDERLAYERS
ROOF STRUCTURE AND LOFT SPACE
GUTTERS AND DOWNPIPES AND SOIL AND VENT PIPES
EXTERNAL WALLS
EXTERNAL JOINERY
EXTERNAL DECORATIONS
INTERNAL
CEILINGS, WALLS, PARTITIONS AND FINISHES
CHIMNEY BREASTS, FLUES AND FIREPLACES
FLOORS
DAMPNESS
INTERNAL
JOINERY
TIMBER DEFECTS
INTERNAL DECORATIONS
LOWER GROUND FLOOR FLAT / APARTMENT
THERMAL EFFICIENCY
OTHER MATTERS
SERVICES
ELECTRICITY
GAS
PLUMBING AND HEATING
BATHROOMS
MAIN DRAINS
OUTSIDE AREAS
EXTERNAL AREAS
POINTS FOR LEGAL ADVISOR
APPENDICES
LIMITATIONS
LIVING IN A MULTI OCCUPIED PROPERTY
ELECTRICAL REGULATIONS
GENERAL INFORMATION ON THE PROPERTY MARKET
INTRODUCTION
Firstly, may we thank you for your instructions; we have now undertaken a Building Survey (formerly known as a Structural Survey) of the aforementioned property.
The Building Survey takes the following format; there is an introductory section (which you are currently reading), which includes a synopsis of the building, and a summary of our findings.
We then go through a detailed examination of the property starting with the external areas working from the top of the property down, followed by the internal areas and the buildings services. We conclude with the section for your Legal Advisor and also attach some general information on the property market.
We are aware that a report of this size is somewhat daunting and almost off-putting to the reader because of this. We would stress that the purchase of a property is usually one of the largest financial outlays made (particularly when you consider the interest you pay as well).
We recommend that you set aside time to read the report in full, consider the comments, make notes of any areas which you wish to discuss further and phone us.
We obviously expect you to read the entire report but we would suggest that you initially look at the summary, which refers to various sections in the report, which we recommend you read first so that you get a general feel for the way the report is written.
As part of our service we are more than happy to talk through the survey as many times as you wish until you are completely happy to make a decision. Ultimately, the decision to purchase the property is yours but we will do our best to offer advice to make the decision as easy as possible.
REPORT FORMAT
To help you understand our Report we utilise various techniques and different styles and types of text, these are as follows:
GENERAL/HISTORICAL INFORMATION
This has been given in the survey where it is considered it will aid understanding of the issues, or be of interest. This is shown in “italics” for clarity.
TECHNICAL TERMS DEFINED
Throughout the Report, we have endeavoured to define anytechnical terms used. This is shown in “Courier New” typeface for clarity.
A PICTURE IS WORTH A THOUSAND WORDS
We utilise photographs and sketches to illustrate issues or features. In some photographs a pencil has been used to highlight a specific area. The sketches are not 100% technically accurate; we certainly would not expect you to carry out work based upon the sketches alone.
ORIENTATION
Any reference to left or right is taken from the front of the property, including observations to the rear, which you may not be able to physically see from the front of the property.
ACTION REQUIRED AND RECOMMENDATIONS
We have used the term ACTION REQUIRED where we believe that there are items that you should carry out action upon or negotiate upon prior to purchasing the property.
Where a problem is identified, we will do our best to offer a solution. However, with most building issues, there are usually many ways to resolve them dependent upon cost, time available and the length of time you wish the repair/replacement to last.
SYNOPSIS
SITUATION AND DESCRIPTION
Flat three is one of seven flats that are set within this newly converted property. The property benefits from communal entrance areas leading to the flat that is situated to the rear of the property.
The property is Leasehold. We have not seen copies of the Lease, but we would be happy to comment if the details are duly forwarded to us. As the property is Leasehold you will no doubt have a shared responsibility for common areas/common components. Common areas/common components include not only the access stairways and corridors but also other areas of shared use such as the roof structure and external walls and the drainage for example.
We believe that the property was originally built in the late 1800s with the recent conversion. If the exact age of the property interests you your Legal Advisor may be able to find out more information from the Deeds.
Putting Life into Perspective!
Some of the things that were happening around the time the property was built:
| 1859 |
Charles Darwin proposes the Theory of Evolution |
| 1863 |
The Opening of London Underground |
| 1878 |
Electric Street Lights are installed in London |
| 1896 |
First modern Olympic Games (Athens) |
| 1899-1902 |
Boer War between Britain and Boers in Southern Africa |
| 1901 |
Queen Victoria Died |
| 1903 |
First flight by Wright Brothers |
| 1912 |
The Beginning of the Motoring Age |
| 1914-1918 |
World War I |
EXTERNAL PHOTOGRAPHS
Front Elevation                                        Communal Entrance Area
Rear View                                                                Balcony
ACCOMMODATION AND FACILITIES
Communal Areas
The Communal Areas consists of:
- Entrance Lobby
- Shared Staircase
We have not seen any information on the estate agent’s details referring to parking, although we did speak to the nursery beneath who did think there were some parking spaces available. Your Legal Advisor needs to check and confirm this.
First Floor
The first floor accommodation consists of:
- Bathroom
- Bedroom
- Master Bedroom with En Suite Shower and access to the balcony
- Lounge and Kitchen (same room divided by doors) and access to the balcony
INTERNAL PHOTOGRAPHS
The following photos are of the internal of the property to help you recall what it looked like and the general ambience (or lack of). We have not necessarily taken photographs of each and every room.
Entrance Hallway                                                       Bathroom
Second Bedroom                                                   Master Bedroom
Living Room                                    Entrance to Kitchen                                       Kitchen             
Communal Areas
     Communal Entrance Area                           Communal Staircase      
SUMMARY OF CONSTRUCTION
Here we give a summary of the construction of the entire property, not just your proposed purchase.
External
| Chimneys: |
One brick chimney |
| Roofs: |
Main roof is pitched and clad with manmade slates with rear flat roofs |
| Gutters and Downpipes: |
Plastic |
| Soil and Vent Pipe: |
Plastic |
| Walls: |
Flemish bond brickwork with stretcher bond brickwork to the rear (assumed) |
| External Joinery: |
Double glazed painted timber windows and painted timber fascias and soffits |
Internal
| Ceilings: |
Plasterboard (assumed) |
| Walls: |
Studwork (assumed) |
| Floors: |
Floor: Joist and floorboard sheets (assumed). |
Services
We believe that the property has a mains water supply, mains drainage, electricity and gas (assumed).
The above terms are explained in full in the main body of the Report. We have used the term ‘assumed’ as we have not opened up the structure.
Executive Summary
Summaries are dangerous as they try to précis often quite complex subjects into a few paragraphs. This is particularly so in a summary about someone’s future home when we are trying to second-guess what their priorities are, so it is important the Report is read in full.
It is inevitable with a report on a building of this nature that some of the issues we have focussed in on you may dismiss as irrelevant and some of the areas that we have decided are part of the ‘character’ of this property you may think are very important. We have taken in the region of 50 plus photographs during the course of this survey and many pages of notes, so if an issue has not been discussed that you are interested in/concerned about, please phone and talk to us before you purchase the property (or indeed commit to purchasing the property), as we will more than likely have noted it and be able to comment upon it. If we have not we will happily go back.
Generally we found the property to be in average condition considering it is new. There are a few specific issues which we would like you to consider in detail. We have divided the Executive Summary into ‘The Good’, ‘The Bad’ and ‘The Ugly’, to help distinguish what in our mind are the main issues.
The Good
Survey reports often are full of only the faults and general ‘doom and gloom’, so we thought we would start with some positive comments on the property!
- Newly refurbished.
- Character property.
- Balcony – albeit that it is located over and next to a nursery playground.
We are sure you can think of other things to add to this list.
The Bad
Problems / issues raised in the ‘bad’ section are usually solvable, but often need negotiation upon. However, a large number of them may sometimes put us off the property.
1) Leaning Chimney
To the left hand side there is a chimney;although this is very difficult to view it appears to be leaning (unless this is an optical illusion!). It could be leaning for many reasons, from deteriorating brickwork to what is known as sulphate attack. Whatever reason we suggest it is dealt with, otherwise it will become a future maintenance cost.
Under the terms of most leases you will have a shared responsibility for such items as this chimney.
ACTION REQUIRED: The chimney needs to be repaired.
ANTICIPATED COST: It will require scaffolding; therefore this alone is likely to cost above £1,000. The developer should pay for this work.
Please see the Chimneys Section of this Report.
2) No Clips To The Edge of The Slates
In our experience the manmade slates will be lifted by the wind unless they are clipped in position.
ACTION REQUIRED: Your Legal Advisor to specifically ask why these slates have not been clipped.
ANTICIPATED COST: Developer to pay for this work.
Please see the Roof Coverings Section of this Report.
3) Awkward Roof Layout
We noted when we viewed the roof (we only viewed about 70% of it) that there are some awkward roof details that have been brought about due to the mixture of roofs on the property. These include the parapet wall and associated flat roof areas; although neither of these are directly above your property.

ACTION REQUIRED: The roofs will need to be checked to ensure that the outlets etc are not getting blocked. Whilst this is unlikely to directly affect you directly it may affect you if roof repairs have to be carried out. We therefore recommend that you appoint a maintenance man to inspect the roofs every few months. Please see the Roof Coverings Section of this Report.
4) Flat Roof – Balcony above you
There is a flat roof directly above you. We noted when we looked in the adjoining flats that there is a proposal to use the roof for a balcony area. There could be some noise transfer from this or, dependent upon the size of the balcony, you may be overlooked.
ACTION REQUIRED: Your Legal Advisor to carry out full investigations for you to confirm the proposal and establish the size.
Please see the Roof Coverings Section of this Report.
5) Brickwork
Unfortunately the re-pointing, whilst well meaning, is not appropriate for this type of construction. A cement mortar has been used rather than a lime based mortar. We recommend you use lime mortar in any future repairs regardless of what the builders say! Using lime mortar will limit further damage to the brickwork, which is almost impossible to repair successfully. However, we would add that many, if not most, of the properties that are re-pointed are re-pointed wrongly; it is only in recent years that we have discovered the problems that can occur from it.
Unfortunately this type of re-pointing encourages dampness and also spalling to softer red bricks.
Spalling Defined
Spalling occurs to brick or stone when water penetrates the surfaceand via freezing and thawing starts to cause deterioration to thesurface. This in turn allows further water penetration and the surface breaks up further. This ultimately can lead to water damage orstructural damage to the area.
ACTION REQUIRED: Lime mortar to be used in any future repairs.
Please see the Walls Section of this Report.
6) Balcony to the Rear
Whilst this is a nice feature we would also comment that you should appreciate how close you are to your neighbour’s balcony and also the nursery playing area is directly in front of the balcony and also underneath it.
             Your balcony                                  View of your balcony taken from next door’s balcony
ACTION REQUIRED: You need to re-visit the property and ensure you are happy with this arrangement.
7) Car Parking
There is very limited car parking for seven flats. We spoke to the nursery who advised that as far as they were aware there were just two parking spaces.
ACTION REQUIRED: Your Legal Advisor to investigate further.
Please see the Outside Areas Section of this Report.
8) En Suite Shower Room
The en suite shower room is very small. The w.c. in particular is positioned very close to the door and it is internal.
Please see the Bathrooms Section of this Report.
9) Multi Occupied Properties – Fire Alarms
This is not so much a ‘bad’ item but one where further investigation is recommended or required.
We would always recommend with a multi occupied property that you have a fully integrated fire alarm system, where if there is a fire in one section of the property you are advised of this and also given an indication as to where it is.
In addition to this there should be regular fire alarm drills.
ACTION REQUIRED: Your Legal Advisor to confirm whether this is the case.
10) View
This item is more a statement of fact. Although you may not notice at first the view is limited (although it could be argued that the majority of the properties in London have a limited view). This photo shows the view from the second bedroom, the adjacent 1960s block of flats, and from the master bedroom and lounge you can see the balcony.
The Ugly
We normally put here things that we feel will be difficult to resolve and will need serious consideration.
There are no items that we feel would fall within this category, although we were disappointed that the developer had wrongly re-pointed the brickwork.
Other Items
Moving on to more general information.
Living in Multi-Occupied Leasehold Properties
This is more a statement of information. There can be problems living in multi occupied properties with anything from noisy neighbours to non-contribution to the ‘sinking fund’. The property is Leasehold, which is very different to having a Freehold property, where you can almost literally do as you like (within the scope of the Law!).
Please see the attachment in the Appendices at the end of this Report.
Sinking Fund / Planned Maintenance - Future Work
With properties such as this there should be a planned maintenance program. We would expect this to be looking at and considering any anticipated works and associated costs at least ten years in advance.
ACTION REQUIRED: Your Legal Advisor to confirm future planned maintenance costs and expenditure.
ANTICIPATED COST: Your Legal Advisor to confirm.
Communal Areas
You need to confirm what the communal areas are.
ACTION REQUIRED: Your Legal Advisor to make enquiries.
Please see the Outside Areas Section of this Report.
Reactive / Day-to-Day Maintenance and Cyclical Maintenance
By reactive / day-to-day maintenance we mean work of a more immediate nature, such as repairs to leaking showers or blocked drains or entry door systems. By cyclical maintenance we mean maintenance carried out on a regular basis such as to the fire alarm system and the lifts and the garden maintenance.
Dependent upon the terms of your lease agreement some of this may come under your responsibility but be managed for you and re-charged back to you by the Management Company.
ACTION REQUIRED: Typically there is a Service Charge for day-to-day maintenance / reactive maintenance and also cyclical maintenance. Your Legal Advisor to confirm costs.
Electrics
As the installation is new we would expect an Institute of Electrical Engineers’ (IEE) Certificate to be available.
ACTION REQUIRED: Your solicitor to request an Institute of Electrical Engineers (IEE) test and report.
Boiler / Central Heating
Again, as the property is newly converted we would expect a CORGI certificate to be available on the property.
ACTION REQUIRED: Your solicitor to request a CORGI certificate.
Maintenance
Although the property is over 100 years old it has recently undergone the refurbishment and ‘repair work’ and therefore maintenance should be at the minimum to start off with. However, we would draw your attention to the appropriateness of the some of the repairs, for example the cement mortar re-pointing of the lime mortar walls. Please see the Walls Section of this Report.
DIY/Handyman Type Work
In this section we would normally comment upon smaller/less skilled jobs that you can carry out by yourself or get a handyman in to do, however under a normal lease (assuming a full repairing and insuring lease) these type of jobs are typically the responsibility of the Landlord (albeit that they usually recharge it to you) with usually only the internal of the property being your responsibility.
Purchase Price
We have not been asked to comment upon the purchase price in this instance, we have however referred you to sources of general information on the housing market within the Information on the Property Market Section, which can be found in the Appendices at the end of the Report.
Every Business Transaction has a Risk
Every business transaction has a risk, only you can assess whether that risk is acceptable to you and your circumstances. You should now read the main body of the Report paying particular attention to any “ACTION REQUIRED” points.
Estimates of Costs
Where we have offered an estimate of building costs please remember we are not experts in this area. We always recommend you obtain quotations for the large jobs before purchasing the property (preferably three quotes). The cost of building work has many variables such as the cost of labour. For unskilled labour we currently use between £75 and £100 per day (the higher costs in the city areas) and for tradesmen we use between £100 and £200 per day for an accredited, qualified, skilled tradesman. Other variations include the quality of materials used and how the work is carried out, for example off ladders or from scaffold.
If you obtain builders estimates that vary widely, we would advise the work is probably difficult or open to various interpretations and we would recommend a specification is prepared. It would probably be best to supervise the work if it is complex, both of which we can do if so required.
Would
you buy a house based on this?
This is an actual Building Society
Valuation Survey, but the names and address have been changed. |
| BUILDIDNG SOCIETY
VALUATION |
GUIDANCE
NOTES
You have chosen a valuation report which is a limited inspection of the
property highlighting only those items which we consider will materially
affect value. It is prepared on instructions from The Building Society
in accordance with the RICS Specification for Residential Mortgage Valuations
a copy of which is available on request.
Valuers cannot see through solids or see things that are hidden by wall
and floor coverings. They will not move furniture or obstructions inside
or outside, lift carpets, crawl under floors, climb ladders outside or
go on roofs or fully enter roof spaces. Valuers will look at the outside
of the property from the garden and adjacent public areas.
Services including central heating system have not been tested.
You still have the option to request a more detailed report and we would
be pleased to help you with this.
The valuer has assumed the property information supplied is correct although
your conveyancer should verify this.
If you wish to discuss any aspect of this report please contact the valuer.
Do not forget to read the Advice for Applicants – it is important.
GUIDANCE NOTES CONT..
You have chosen a valuation report which is a limited inspection of the
property highlighting only those items which we consider will materially
affect value. It is prepared on instructions from The Building Society
in accordance with the RICS Specification for Residential Mortgage Valuations
a copy of which is available on request.
Valuers cannot see through solids or see things that are hidden by wall
and floor coverings. They will not move furniture or obstructions inside
or outside, lift carpets, crawl under floors, climb ladders outside or
go on roofs or fully enter roof spaces. Valuers will look at the outside
of the property from the garden and adjacent public areas.
Services including central heating system have not been tested.
You still have the option to request a more detailed report and we would
be pleased to help you with this.
The valuer has assumed the property information supplied is correct although
your conveyancer should verify this.
If you wish to discuss any aspect of this report please contact the valuer.
Do not forget to read the Advice for Applicants – it is important. |
|
Mr and Mrs Worried
1 Old House
Old Road
Old Town |
|
PROPERTY:
New House
New Road
New Town
Roll No: 12345678
Date Inspected: 11 November 2003 |
|
| DESCRIPTION: Type/Accommodation:
A two bedroom semi detached bungalow
Neighbourhood: The property is in a private residential area
Age: The property is around 40 years old |
|
CONSTRUCTION:
Walls: Roof
Roof: Tiled
Services: All mains services are availableVALUATION & MARKET COMMENT
In its present condition and with the current state of the property market
my
Valuation of the property is £170,000 |
|
| MATTERS AFFECTING VALUE:
In addition to items of routine maintenance and repair, urgent repairs
are required to the following:-
There is structural movement to the garage. You now need to get a structural
engineer (or chartered building surveyor) to make a detailed investigation
providing you with a full report identifying the cause, together with
the costs of the work necessary to ensure future stability. I cannot give
a valuation until I have seen the report.
External woodwork requires overhaul, repair or replacement.
Aspects of the service installations give cause for concern and you should
obtain specialist advice.
The garage roof is thought to contain asbestos material which may represent
a health hazard. You should instruct a licensed specialist to check the
property, as remedial work may be required. This work could be expensive
and may have to comply with legal requirements.
|
|
MATTERS FOR YOUR CONVEYANCER
Tenure: I understand the property is freehold. |
|
VALUER
Signature:
Name:
Address:
Telephone: |
We are sure you'll agree our surveys are considerably better than the rivals.
To get a quote for a survey on your property click
here.